Procurement Opportunities

Please click here to access Quest CDN site to view current construction bid opportunities.

Please click here to access Bonfire Portal site to view current Request for Proposal and Request for Application opportunities.

Loading information ...
All Listings
Due
6/3/2021 2:00 pm US/Central
Past
J04069C03 - Dryer 2 Alignment, Tire and Trunnion Repairs and Non- Destructive Evaluation (NDE) at the Jones Island Water Reclamation Facility
Due
6/8/2021 10:30 am US/Central
Past
M01040C01 - 13th Street Roof and HVAC Upgrades
Due
6/17/2021 9:00 am US/Central
Past
TS-2689 - LANDSCAPE AND VEGETATION MAINTENANCE CONTRACTOR REQUEST FOR QUALIFICATIONS
Due
6/17/2021 10:30 am US/Central
Past
M01037C06 - Administrative Facilities New Asphalt Pavement, Sidewalks, Concrete Stairs, and New Loading Docks
Due
6/23/2021 10:00 am US/Central
Past
S06038C17 - Stop Logs for the South Shore Water Reclamation Facility
Due
6/30/2021 10:00 am US/Central
Past
TS-2687 - Basin H Central MIS PCB Remediation - Liquid Treatment and Sediment Dewatering Firms/Teams
Due
6/30/2021 10:00 am US/Central
Past
TS-2688 - Basin H Central MIS PCB Remediation - Sewer Cleaning Firms
Due
7/6/2021 10:00 am US/Central
Past
M06014D03 - Water Reclamation Facilities Building Information Modeling Phase Five Project
Due
7/9/2021 10:00 am US/Central
Past
M04002P20 - BUSINESS CAPACITY DEVELOPMENT AND MANAGEMENT TRAINING
Due
7/20/2021 10:00 am US/Central
Past
C98047C07 - Metropolitan Sewer System Access Hatch Frame and Cover Replacement Phase 7
Due
7/27/2021 10:00 am US/Central
Past
G98012P01 - Professional Services - District Tree Planting Project
Due
7/27/2021 3:00 pm US/Central
Past
M03113P01 - Preliminary Engineering – Disinfection Improvements Water Reclamation Facilities
Due
8/3/2021 10:00 am US/Central
Past
TS-2690 - On-Call Levee System Inspection Services
Due
8/3/2021 11:00 am US/Central
Past
C05051C01 - Edgewood Avenue Near Surface Collector Extension
Due
8/5/2021 2:00 pm US/Central
Past
C98055C01 - DC0101 GATE REPLACEMENTS AT SOUTH 27TH STREET AND HOWARD AVENUE (REBID)
Due
8/5/2021 2:00 pm US/Central
Past
J06080C09 (REBID) - Tunnel 271 Piping Replacement at the Jones Island Water Reclamation Facility
Due
8/19/2021 10:00 am US/Central
Past
C98063E01 - Preliminary Engineering - Siphons-Phase 1
Due
8/23/2021 10:00 am US/Central
Past
P-3000 - Ice and Snow Removal Services at MMSD Headquarters and Laboratory Facilities, Fall 2021-Spring 2025
Due
8/24/2021 10:30 am US/Central
Past
W40002E38 - DECONSTRUCTION AND SALVAGE or DEMOLITION KINNICKINNIC RIVER FLOOD MANAGEMENT BID PACKAGE #20
Due
8/25/2021 10:30 am US/Central
Past
J06075C10 - DEWATERING AND DRYING FACILITY STANDPIPE INSTALLATION AT JONES ISLAND WATER RECLAMATION FACILITY
Due
8/26/2021 2:00 pm US/Central
Past
S06038C19 - RETURN ACTIVATED SLUDGE VALVE REPLACEMENTS AT THE SOUTH SHORE WATER RECLAMATION FACILITY
Due
8/31/2021 10:00 am US/Central
Past
M98001D01 - Engineering Services - Dredged Material Management Facility (DMMF)
Due
8/31/2021 10:00 am US/Central
Past
P-3001 - State Lobbyist Services
Due
8/31/2021 10:30 am US/Central
Past
S03004C01 - Effluent Pump MCC and VFD Upgrades at South Shore Water Reclamation Facility
Due
9/8/2021 10:30 am US/Central
Past
J01028C01 - JIWRF Primary Clarifiers Drive Improvements
Due
9/8/2021 10:30 am US/Central
Past
J02015C01 - Jones Island Water Reclamation Facility Aeration Basin Concrete Rehabilitation
Due
9/9/2021 2:00 pm US/Central
Past
S06038C14 - BUILDINGS 306 AND 307 ROOF REPLACEMENTS AT THE SOUTH SHORE WATER RECLAMATION FACILITY
Due
9/16/2021 2:00 pm US/Central
Past
C98055C02 - MH 01101 Gate Stem Replacement at Milwaukee and Mason Streets
Due
9/21/2021 10:00 am US/Central
Past
G98022D01 - Design Services - Becher Overpass Project
Due
9/22/2021 10:15 am US/Central
Past
S06038C18 - Battery 5 and 6 Activated Sludge Transfer Pumps Replacement at South Shore Water Reclamation Facility
Due
9/30/2021 11:00 am US/Central
Past
TS-2696 - On-Call Diggers Hotline Assessment & Field Marking
Due
10/4/2021 1:00 pm US/Central
Past
M03110P01 - Planning Services - NFPA 820 WRF Study
Due
10/12/2021 10:00 am US/Central
Past
C98055C03 - NS-3 Junction Chamber Sluice Gate Actuator Replacement
Due
10/12/2021 10:00 am US/Central
Past
P-3016 - Private Property Infiltration and Inflow Reduction - Municipal Contractors
Due
10/15/2021 10:30 am US/Central
Past
W98002C30 - Milwaukee County Grounds Floodwall Repair
Due
10/19/2021 10:30 am US/Central
Past
J06080C10 - Powerhouse Waste Heat Duct Insulation Replacement at the Jones Island Water Reclamation Facility
Due
10/20/2021 12:00 pm US/Central
Past
M06011C01 - Physical Security Risk Assessment and Security Improvements
Due
10/21/2021 10:00 am US/Central
Past
P-3020 - Flexible Packaging and Pre-Formed Bag Supplies
Due
10/22/2021 10:00 am US/Central
Past
TS-2697 - Engineering Inspection Services - General On-Call Concrete and Soil Testing
Due
10/26/2021 1:00 pm US/Central
Past
P-3010 - Gravity Belt Thickener Equipment
Due
11/4/2021 10:30 am US/Central
Past
W29002C01 - Burnham Canal Wetland Base
Due
11/10/2021 10:00 am US/Central
Past
W24010D01 - Engineering Services - State Fair Culverts Rehabilitation
Due
11/18/2021 2:00 pm US/Central
Past
J04069C08 - Dryer Indefinite Quantity Services at Jones Island Water Reclamation Facility
Due
11/19/2021 10:00 am US/Central
Past
P-3022 - Private Property Inflow and Infiltration Reduction (PPI/I) Residential Plumbing Contractors
Due
12/2/2021 10:30 am US/Central
Past
P01005C06 - Pipeline Cleaning Phase 2 - Interplant Sludge System Improvements
Due
12/9/2021 10:00 am US/Central
Past
P-3021 - POINT OF PURCHASE MATERIALS DISTRIBUTION SERVICES FOR MILORGANITE® FERTILIZER
Due
12/10/2021 1:00 pm US/Central
Past
S02008C07 - BLENDING IMPROVEMENTS AT SOUTH SHORE WATER RECLAMATION FACILITY
Due
12/16/2021 10:30 am US/Central
Past
W45002C01 - WILSON PARK CREEK REACH 3 PHASE 1 - DETENTION BASIN
Due
12/16/2021 2:00 pm US/Central
Past
J06075C19 - DILUTION & MIXING TANKS 1 & 2 REHABILITATION AT JONES ISLAND WRF (REBID)
Due
12/16/2021 2:00 pm US/Central
Past
J04069C09 - ON HOLD - Dryer 2 Tire Welding Repairs at the Jones Island Water Reclamation Facility
Due
1/7/2022 10:00 am US/Central
Past
G98023P01 - Planning, Design, and Implementation of Fresh Coast Protection Partnership Phase Two
Due
1/14/2022 10:00 am US/Central
Past
J04074D01 - ENGINEERING SERVICES - MILORGANITE® PACKAGING FACILITY
Due
1/21/2022 10:00 am US/Central
Past
C05041C03 - Basin H Central MIS PCB Remediation (Rebid)
Due
2/8/2022 11:00 am US/Central
Past
S06038C20 - Dissolved Air Flotation (DAF) Pump Replacements at South Shore Water Reclamation Facility
Due
2/9/2022 10:00 am US/Central
Past
J06080C11 - Grit Dewatering Screw Conveyor Tail Bearing Replacement at the Jones Island Water Reclamation Facility
Due
2/9/2022 10:00 am US/Central
Past
J04037C04 - Jones Island Water Reclamation Facility Field Staff Office Improvements
Due
2/10/2022 2:00 pm US/Central
Past
J06075C24 - AERATION BASIN #11S ISOLATION VALVE REPLACEMENT AND EFFLUENT REUSE PIPING REPAIRS AT THE JONES ISLAND WATER RECLAMATION FACILITY
Due
2/11/2022 2:00 pm US/Central
Past
J04069C04 - Twelve Dryer Trunnions
Due
2/15/2022 10:30 am US/Central
Past
J04037C02 - Thickened Sludge Improvements at Jones Island Water Reclamation Facility
Due
2/23/2022 10:30 am US/Central
Past
C02010E02 - Franklin Muskego Force Main Improvements
Due
2/24/2022 2:00 pm US/Central
Past
S06038C21 - HEAT EXCHANGER #9N AND HOT WATER PUMP REPLACEMENT AT THE SOUTH SHORE WATER RECLAMATION FACILITY
Due
2/25/2022 10:30 am US/Central
Past
J06080C12 - BAR SCREEN NO. 3 EFFLUENT ISOLATION SLUICEGATE REPAIRS AT THE JONES ISLAND WATER RECLAMATION FACILITY
Due
2/28/2022 10:30 am US/Central
Past
S06047E01 - PRELIMINARY ENGINEERING – RELAY COORDINATION AND GENERATOR/SWITCHGEAR CONTROLS EVALUATION AT SOUTH SHORE WATER RECLAMATION FACILITY
Due
3/1/2022 10:00 am US/Central
Past
S06050D01 - Engineering Services - HVAC System Improvements in Buildings 378 and 380 at South Shore Water Reclamation Facility
Due
3/3/2022 10:30 am US/Central
Past
J06075C25 - Dryer No. 3 and Dryer No. 7 Exhaust Damper Replacements at Jones Island Water Reclamation Facility
Due
3/9/2022 10:00 am US/Central
Past
G98004P83 - 2022 Green Infrastructure Partnership Program
Due
3/11/2022 10:00 am US/Central
Past
P-3037 - Private Property Inflow and Infiltration Reduction - Residential Plumbing Contractors
Due
3/16/2022 10:00 am US/Central
Past
G98008P04 - Neighborhood Outreach and Green Infrastructure Installation - Suburban 2022-2023
Due
3/17/2022 10:30 am US/Central
Past
M03112P01 - PLANNING SERVICES – SCADA, INSTRUMENTATION AND CONTROL SYSTEM MASTER PLAN
Due
3/23/2022 10:00 am US/Central
Past
P-3046 - Furnish and Deliver 400 HP Explosion Proof Electrical Motor
Due
3/24/2022 10:00 am US/Central
Past
J04072C01 - Milorganite Fertilizer Transport and Silo Storage Equipment Replacement at Jones Island Water Reclamation Facility
Due
3/24/2022 12:00 pm US/Central
Past
W98002C36, W98002C37. W98002C38. W98002C39 - 2022 - 2023 Watercourse Maintenance Contract - Northeast Area, Northwest Area, Southeast Area, Southwest Area
Due
3/25/2022 10:30 am US/Central
Past
W98002C40 - 2022 – 2023 Watercourse Maintenance Invasive Species Management Lincoln Creek
Due
3/28/2022 10:30 am US/Central
Past
W98002C41 - 2022 - 2023 Invasive Species Management: County Grounds, Underwood Creek-Phase 1, and Underwood Creek-Phase 2
Due
3/29/2022 10:30 am US/Central
Past
W98002C42 - 2022 - 2023 Watercourse Maintenance Invasive Species Management Kinnickinnic River 6th Street to I-94 and Edgerton Channel
Due
3/31/2022 10:00 am US/Central
Past
P-3043 - Four-Year HVAC Maintenance Services
Due
3/31/2022 2:00 pm US/Central
Past
J06075C27 - Primary Clarifier Drain Valve and Gate Actuator Replacement at the Jones Island Water Reclamation Facility
Due
4/5/2022 10:00 am US/Central
Past
W50005D07 - 1436 E. Forest Hill Ave. Soil Cap Addition
Due
4/5/2022 10:00 am US/Central
Past
C04013C01 - Brown Deer Sewer
Due
4/7/2022 10:00 am US/Central
Past
C03014D01 - Greenfield Park and Underwood Creek Pump Stations Upgrades
Due
4/7/2022 10:30 am US/Central
Past
I03011C02 - Outfall Backflow Prevention
Due
4/7/2022 2:00 pm US/Central
Past
J06080C07 - West Plant Return Activated Sludge Channel Repair
Due
4/20/2022 10:00 am US/Central
Past
TS-2707 - On-Call Weld Testing, Inspection, and Welding Engineering Services
Due
4/21/2022 10:00 am US/Central
Past
W61003E01 - Preliminary Engineering – Fish Creek Flood Management – I-43 Expansion
Due
5/3/2022 10:00 am US/Central
Past
M10004C05 - Repair of Failing Sanitary Laterals
Due
5/17/2022 10:00 am US/Central
Past
J06084C01 - Cooling Water Modifications at the Jones Island Water Reclamation Facility
Due
5/18/2022 10:00 am US/Central
Past
S02018D01 - Engineering Services - RAS Pump Replacement at South Shore Water Reclamation Facility
Due
5/18/2022 4:30 pm US/Central
Past
P-3063 - Third Party Administration and Network Performance
Due
5/23/2022 10:00 am US/Central
Past
P-3062 - FURNISH AND DELIVER LABORATORY CHEMICALS AND SUPPLIES
Due
6/2/2022 2:00 pm US/Central
Past
C98059C04 - DC0409 and Associated MIS Cleaning
Due
6/2/2022 2:00 pm US/Central
Past
J06080C13 - East Plant Concrete Catwalk Repairs
Due
6/9/2022 2:00 pm US/Central
Past
J06075C28 - Equalization & Blend Tank #1 Overflow Piping Replacement
Due
6/16/2022 2:00 pm US/Central
Past
J06075C29 - PRIMARY SLUDGE SCREENS 1, 2 AND 3 REPLACEMENT AT THE JONES ISLAND WATER RECLAMATION FACILITY
Due
6/22/2022 10:00 am US/Central
Past
P-3067 - Used Roll-Off Truck
Due
6/23/2022 10:00 am US/Central
Past
C98055C05 - CCTV Vehicles and Equipment
Due
7/7/2022 10:00 am US/Central
Past
TS-2706 - Construction Management Services
Due
7/7/2022 10:30 am US/Central
Past
S06047C01 - Relay Synchronization at South Shore Water Reclamation Facility
Due
7/8/2022 10:00 am US/Central
Past
C03013D01 - Engineering Services - Oklahoma Avenue Metropolitan Interceptor Sewer Capacity Improvements
Due
7/11/2022 10:00 am US/Central
Past
G98012P02 - Tree Planting on District Property
Due
7/13/2022 10:00 am US/Central
Past
C98063E02 - SIPHONS PHASE 1 CONDITION ASSESSMENT
Due
7/21/2022 10:00 am US/Central
Past
S04038C01 - DIGESTER 3 CLEANING AT SOUTH SHORE WATER RECLAMATION FACILITY
Due
7/27/2022 10:00 am US/Central
Past
P-3076 - Access No. 5 Exit Door Replacement
Due
7/28/2022 1:00 pm US/Central
Past
J04077D01 - ENGINEERING SERVICES – EQUALIZATION AND BLEND TANKS ODOR CONTROL
Due
7/29/2022 4:00 pm US/Central
Past
P-3069 - Digital Transformation Planning and Resulting Digital Transformation Plans
Due
8/10/2022 10:00 am US/Central
Past
P-3070 - Temporary Staffing Services
Due
8/11/2022 10:00 am US/Central
Past
J04076D01 - Engineering Services - Compressed Air System Improvements at Jones Island Water Reclamation Facility
Due
8/18/2022 10:00 am US/Central
Past
P-3059 - Air Quality Engineering Services for MMSD Water Reclamation Facilities
Due
8/25/2022 2:00 pm US/Central
Past
S06038C24 - South Shore Water Reclamation Facility Concrete Pavement Replacement
Due
8/31/2022 10:00 am US/Central
Past
P-3075 - Janitorial Services
Due
9/1/2022 11:00 am US/Central
Past
W98006P02 - On-Call Professional Services for Reforestation Activities
Due
9/9/2022 4:00 pm US/Central
Past
P-3090 - COMPENSATION CONSULTING SERVICES
Due
9/13/2022 10:00 am US/Central
Past
C98055C05 - CCTV Vehicles and Equipment - REBID
Due
9/13/2022 10:00 am US/Central
Past
G98025D01 - Design Services - Mineral Overpass Project
Due
9/14/2022 1:30 pm US/Central
Past
J06093C01 - GE Turbine Overhaul at Jones Island Water Reclamation Facility
Due
9/14/2022 4:00 pm US/Central
Past
P-3087 - Acid Crock Electronic Monitoring and Maintenance & Caustic Chemical Supply
Due
9/23/2022 2:00 pm US/Central
Past
J04069C09 - Dryer 2 Tire Replacement - Phase 1
Due
9/27/2022 10:30 am US/Central
Past
S06038C22 - Motor Fuel System Replacement at South Shore Water Reclamation Facility
Due
9/28/2022 10:00 am US/Central
Past
P-3089 - Nitrogen Analyzer
Due
9/29/2022 2:00 pm US/Central
Past
J06075C28 REBID - EQUALIZATION AND BLEND TANK OVERFLOW PIPING REPLACEMENT
Due
10/4/2022 10:00 am US/Central
Past
TS-2708 - Boiler Feed System Replacement at South Shore Water Reclamation Facility
Due
10/6/2022 2:00 pm US/Central
Past
C98059C04 REBID - DC0409 CLEANING
Due
10/11/2022 10:00 am US/Central
Past
G98002P16 - Climate Resilient Watersheds Metrics Tracking
Due
10/11/2022 10:00 am US/Central
Past
J06082C01 - Flood Resiliency Improvements at Jones Island Water Reclamation Facility
Due
10/11/2022 10:00 am US/Central
Past
C98064P01 - Planning Services - MIS Renewal and Infiltration Reduction Strategy
Due
10/12/2022 11:00 am US/Central
Past
M01047C01 - Landscape Maintenance - Headquarters
Due
10/19/2022 10:00 am US/Central
Past
P-3092 - PRIVATE PROPERTY INFILTRATION AND INFLOW REDUCTION MUNICIPAL CONTRACTORS
Due
11/4/2022 10:00 am US/Central
Past
P-3090 - Laboratory Analysis Services
Due
11/9/2022 10:00 am US/Central
Past
P-3082 - PRIVATE PROPERTY INFILTRATION AND INFLOW REDUCTION RESIDENTIAL PLUMBING CONTRACTORS
Due
11/17/2022 10:00 am US/Central
Past
J06080C16 - Sodium Hypochlorite Storage Tank 2 Repairs at the Jones Island Water Reclamation Facility
Due
11/17/2022 2:00 pm US/Central
Past
S06045C12 - Building 378 Interim HVAC Repairs
Due
11/23/2022 10:00 am US/Central
Past
M01044D01 - Engineering Services for MMSD Headquarters and Lab Building Remodel Project
Due
11/29/2022 1:00 pm US/Central
Past
M01037C07 - Administrative Facilities Elevator Upgrades
Due
11/30/2022 10:00 am US/Central
Past
P-3096 - On-Call Electrical Services for Headquarters, Central Laboratory, and 13th Street Facilities
Due
11/30/2022 10:00 am US/Central
Past
P-3095 - On-Call Plumbing Services for Headquarters, Central Laboratory, and 13th Street Facilities
Due
12/6/2022 10:30 am US/Central
Past
J06080C18 - Vacuum Piping Repairs at Jones Island Water Reclamation Facility
Due
12/7/2022 10:30 am US/Central
Past
J04064C01 - Chaff System Improvements at Jones Island Water Reclamation Facility
Due
12/13/2022 10:00 am US/Central
Past
S02008C06 - Secondary Clarifier Instrument Relocation at the South Shore Water Reclamation Facility
Due
12/15/2022 10:00 am US/Central
Past
P-3101 - Fume Hood Disconnection, Disposal, and Reconnection
Due
12/20/2022 10:00 am US/Central
Past
I05002C01 - Combined Sewer Overflow (CSO) 195 Relocation
Due
12/22/2022 2:00 pm US/Central
Past
J06075C30 - WEST PLANT GALLERY ROOF DRAIN PIPING REPLACEMENT
Due
1/12/2023 10:30 am US/Central
Past
J04070C02 - Phase I Slide Gate Upgrades at Dewatering and Drying Facility
Due
1/13/2023 10:00 am US/Central
Past
S02015C02 - Aeration System Upgrade at South Shore Water Reclamation Facility (SSWRF) - Informational Meeting
Due
1/23/2023 12:00 pm US/Central
Past
P-3109 - Professional Services for Digital Transformation Framework
Due
2/9/2023 10:00 am US/Central
Past
J04075C01 - DEWATERING AND DRYING BELT FILTER PRESS OVERHAULS AT JONES ISLAND WRF
Due
2/17/2023 2:00 pm US/Central
Past
P-3114 - Security Services
Due
2/23/2023 2:00 pm US/Central
Past
J06080C07 REBID - West Plant Return Activated Sludge Channel Repair
Due
3/1/2023 10:30 am US/Central
Past
W98008C01, W98008C02, W98008C03 - 2023-2026 Watercourse Maintenance Invasive Species Management
Due
3/9/2023 2:00 pm US/Central
Past
S06038C27 - Tunnels 1, 4 and 5 Natural Gas Piping Replacement
Due
3/22/2023 10:30 am US/Central
Past
S02017D01 - Engineering Services - Blower Branch Pipe Replacement at the South Shore Water Reclamation Facility
Due
3/28/2023 2:00 pm US/Central
Past
J06075C23 - Dewey Substation Transformer Repairs
Due
4/5/2023 10:00 am US/Central
Past
I98007P01 - Planning Services - Ventilation and Odor Study for the Inline Storage System
Due
4/6/2023 10:00 am US/Central
Past
P-3117 - Consulting Services - Electric Rate Design and Analysis
Due
4/6/2023 10:00 am US/Central
Past
TS-2713 - General On-Call USACE Engineering Services for Watercourse Facilities
Due
4/6/2023 10:30 am US/Central
Past
W10005C01 - Kletzsch Dam Repair and Fish Passage Construction
Due
4/11/2023 10:00 am US/Central
Past
S04038C02 - Digesters 4 and 10 Cleaning at South Shore Water Reclamation Facility
Due
4/12/2023 10:00 am US/Central
Past
P-3122 - On-Call Architectural and Engineering Services for Administrative Facilities and Laboratory
Due
4/18/2023 12:00 pm US/Central
Past
P-3118 - Predictive Forecasting for Automated Wet Weather Operations of a Sewerage Conveyance and Storage System
Due
4/19/2023 10:00 am US/Central
Past
TS-2714 - On-Call Conveyance Construction
Due
4/24/2023 4:00 pm US/Central
Past
P-3133 - Compensation Consulting Services
Due
4/28/2023 10:00 am US/Central
Past
TS-2710 - Construction Management Services
Due
5/9/2023 10:30 am US/Central
Past
S06038C29 - SLUICEGATE ACTUATOR REPLACEMENTS AT SOUTH SHORE WATER RECLAMATION FACILITY
Due
5/11/2023 10:00 am US/Central
Past
P-3126 - Rain Barrels and Diverter Kits
Due
5/17/2023 10:00 am US/Central
Past
S06045C14 - Digester Sphere Wet Abrasive Blast and Re-Coat at South Shore Water Reclamation Facility
Due
5/18/2023 10:00 am US/Central
Past
J06080C17 - Scum Concentrator Overhaul at Jones Island Water Reclamation Facility
Due
5/18/2023 10:30 am US/Central
Past
S02015C01 - Aeration System Upgrade at South Shore Water Reclamation Facility
Due
5/25/2023 2:00 pm US/Central
Past
C98059C06 - Large Diameter MIS/NSC Cleaning
Due
5/31/2023 9:00 am US/Central
Past
J02016D01 - ENGINEERING SERVICES – PROCESS AIR COMPRESSOR SYSTEM UPGRADE AT JONES ISLAND WATER RECLAMATION FACILITY
Due
6/1/2023 10:00 am US/Central
Past
P-3130 - Fresh Coast Works Project Ambassadors 2023-2025 Program
Due
6/2/2023 2:00 pm US/Central
Past
P-3143 - Post-2027 Operations Financial Analysis
Due
6/8/2023 10:00 am US/Central
Past
W24004E01 and W40002E41 - CONTRACT NO. W24004E01 DECONSTRUCTION, 8122 W. ARTHUR AVENUE AND CONTRACT NO. W40002E41 DECONSTRUCTION, KINNICKINNIC RIVER FLOOD MANAGEMENT
Due
6/8/2023 10:30 am US/Central
Past
G98022C01 - Becher Overpass Green Infrastructure
Due
6/13/2023 10:30 am US/Central
Past
M01040C02 - 13th Street Monitoring Garage and Lab Upgrade
Due
6/15/2023 10:30 am US/Central
Past
C02014E01 - Condition Assessment of Pipe 42406
Due
7/11/2023 10:00 am US/Central
Past
M03119P01 - Planning Services - Impacts of the 1,000-Year Flood
Due
7/13/2023 10:30 am US/Central
Past
C98067C01 - Gate Replacement Metropolitan Interceptor Sewer
Due
7/14/2023 10:30 am US/Central
Past
C05055C01 - North 35th Street & West Roosevelt Drive Improvements
Due
7/19/2023 2:00 pm US/Central
Past
C98059C07 - Lincoln Avenue MIS Cleaning
Due
7/25/2023 11:00 am US/Central
Past
W24010C01 - State Fair Culverts Rehabilitation (Phase One)
Due
7/27/2023 10:00 am US/Central
Past
S06045C17 - Final Effluent Pump No. 5 Rebuild at South Shore Water Reclamation Facility
Due
7/27/2023 2:00 pm US/Central
Past
J06080C19 - Uninterruptible Power Supply Replacements at the Jones Island Water Reclamation Facility
Due
7/28/2023 10:30 am US/Central
Past
C98065D01 - Engineering Services - Sanitary Sewer Outfall (SSO) Abandonment
Due
7/31/2023 10:00 am US/Central
Past
P-3128 - Private Property Inflow and Infiltration Reduction - Residential Plumbing Contractors (Pipe Check Program)
Due
8/8/2023 1:30 pm US/Central
Past
W20028C01 - WESTERN MILWAUKEE PHASE 2B LEVEE AND FLOODWALL
Due
8/15/2023 10:30 am US/Central
Past
J04069C12 - Cake Slurry Mix Tank Relining at the JIWRF
Due
8/15/2023 2:00 pm US/Central
Past
S06045C13 - Secondary Clarifier 19 Grout Flooring Replacement
Due
8/22/2023 10:00 am US/Central
Past
J04057D02 - Engineering Services - Milorganite® Dryer Exhaust Duct Header and Damper Replacement at Jones Island WRF
Due
8/23/2023 2:00 pm US/Central
Past
P-3152 - Post-2027 Operations Financial Analysis
Due
8/24/2023 10:00 am US/Central
Past
P-3101 REBID - Fume Hood Disconnection, Disposal, and Reconnection
Due
8/25/2023 10:00 am US/Central
Past
TS-2717 - On-Call Engineering Services - Conveyance Facilities
Due
9/6/2023 10:00 am US/Central
Past
P-3137 - Auditing Services
Due
9/6/2023 1:00 pm US/Central
Past
C98066E01 - Preliminary Engineering – Condition Assessment of Conveyance Hydrogen Sulfide Priority Sites
Due
9/7/2023 10:00 am US/Central
Past
J06075C31 - Dilution and Mixing Tank Mixer Replacements at Jones Island Water Reclamation Facility
Due
9/7/2023 10:00 am US/Central
Past
P-3155 - Private Property Infiltration and Inflow Reduction - Municipal Contractors (PPII-M)
Due
9/29/2023 1:00 pm US/Central
Past
P-3167 - Dry Pit Submersible Pump Equipment - Request for Information
Due
10/3/2023 10:00 am US/Central
Past
I06001C01 - NS12 Collector System Improvements
Due
10/5/2023 3:00 pm US/Central
Past
P-3163 - Natural Gas Supply Services
Due
10/12/2023 10:00 am US/Central
Past
J01018C06 - ISS Pump Repairs at Jones Island Water Reclamation Facility
Due
10/12/2023 10:00 am US/Central
Past
P-3149 - Medical Services for MMSD Employees
Due
10/12/2023 10:00 am US/Central
Past
P-3168 - Snow and Ice Removal Services
Due
10/12/2023 1:00 pm US/Central
Past
P-3166 - Odor Control Equipment
Due
10/24/2023 10:00 am US/Central
Past
P-3160 - Household Hazardous Waste Program
Due
11/8/2023 10:00 am US/Central
Past
I98007P01 REBID - Planning Services – Ventilation and Odor Study for the Inline Storage System
Due
11/8/2023 10:30 am US/Central
Past
S06038C33 - Digester Sludge Recirculation Pump Replacements at South Shore Water Reclamation Facility
Due
11/14/2023 10:00 am US/Central
Past
C98061E01 - Preliminary Engineering - Outfall Condition Assessment Phase 1
Due
11/20/2023 10:00 am US/Central
Past
C98059C09 - Bollard Installation at Various Conveyance Sites
Due
11/21/2023 1:00 pm US/Central
Past
S04029D01 - ENGINEERING SERVICES – DIGESTER MIXING PHASE 2 AND BUILDING MODIFICATIONS
Due
11/30/2023 2:00 pm US/Central
Past
P-3165 - Natural Gas Purchasing Advisory Services
Due
12/5/2023 10:00 am US/Central
Past
G98026D01 - Design Services - Port Milwaukee Overpass Project
Due
12/5/2023 10:00 am US/Central
Past
J01018C07 - Professional Services – ISS Pump Repairs Technical Support at Jones Island Water Reclamation Facility
Due
12/6/2023 2:00 pm US/Central
Past
J06086D01 and S06048D01 - Jones Island and South Shore Water Reclamation Facilities Building Roofs Replacement Project - Phases 4 and 5
Due
12/8/2023 10:00 am US/Central
Past
P-3173 RFQ - Security System Integrators for Contract M01048C01, Security Management System Improvements
Due
12/12/2023 10:30 am US/Central
Past
J03006-S03005D01 - Engineering Services - Disinfection Process Improvements
Due
12/15/2023 10:30 am US/Central
Past
M98001C01 - Dredged Material Management Facility
Due
12/19/2023 10:00 am US/Central
Past
K01016P01 - Planning Services – Predictive Wastewater Flow Forecasting for Wet Weather Operations
Due
12/21/2023 1:00 pm US/Central
Past
P-3179 (RFI) - WEATHER FORECASTING SERVICES
Due
1/11/2024 10:30 am US/Central
Past
J04070C03 - Phase II Slide Gate Upgrades at Dewatering and Drying Facility
Due
1/11/2024 11:00 am US/Central
Past
G98029P01 - Planning, Design, and Implementation of Community Based Green Infrastructure Phase Three
Due
1/18/2024 10:00 am US/Central
Past
S04039D01 - Engineering Services - Primary Sludge Thickening and Acid Phase Digestion at South Shore Water Reclamation Facility
Due
1/18/2024 10:30 am US/Central
Past
C06023C01 - Veterans Affairs Grounds Metropolitan Interceptor Sewer Relocation
Due
1/24/2024 10:30 am US/Central
Past
J06075C32 - Operations Building Freight Elevator Modernization at Jones Island Water Reclamation Facility
Due
1/24/2024 2:00 pm US/Central
Past
J04079C01 REBID - Dryer Tire and Trunnion Replacement
Due
1/25/2024 10:00 am US/Central
Past
TS-2715 - General On-Call Engineering Services for Watercourse Facilities
Due
1/30/2024 1:00 pm US/Central
Past
Contractors - 2024 Annual Contractors Meeting
Due
1/31/2024 1:00 pm US/Central
Past
Consultants - 2024 Annual Consultants Meeting
Due
1/31/2024 2:00 pm US/Central
Past
C98059C08 - KK04 Carbon Media Replacement
Due
2/2/2024 12:00 pm US/Central
Past
W98006P16 - Trees, Shrubs, and Saplings for Mequon Nature Preserve
Due
2/16/2024 10:00 am US/Central
Past
C03015E01 - Conveyance System Septic Conditions Mitigation
Due
2/22/2024 10:00 am US/Central
Past
P-3191 - Furnish and Deliver 400 HP Explosion Proof Electrical Motor to the Jones Island Water Reclamation Facility
Due
2/22/2024 10:00 am US/Central
Past
TS-2721 - On-Call Engineering Services for Water Reclamation Facilities
Due
2/22/2024 10:30 am US/Central
Past
S04038C03 - Digesters 4 and 12 Cleaning at South Shore Water Reclamation Facility
Due
2/22/2024 4:00 pm US/Central
Past
P-3188 - Grant Administration Process Assessment
Due
2/23/2024 10:00 am US/Central
Past
P-3173 REBID - Security System Integrators for Contract M01048C01, Security Management System Improvements
Due
2/23/2024 4:00 pm US/Central
Past
M06016C08 - Payroll Services Provider
Due
2/26/2024 4:00 pm US/Central
Past
P-3201 - Water Career Videos (Request for Quotes)
Due
2/28/2024 10:00 am US/Central
Past
P-3197 - SPECIFICATION SECTION 11372 COMPRESSED AIR SYSTEM EQUIPMENT, RFI NO. P-3197
Due
2/28/2024 10:00 am US/Central
Past
P-3198 - SPECIFICATION SECTION 11373 COMPRESSED AIR SYSTEM MASTER CONTROLLER, RFI NO. P-3198
Due
2/28/2024 10:00 am US/Central
Past
G98008P05 - Suburban Neighborhood Outreach and Green Infrastructure Installation Program 2024-2027
Due
2/29/2024 10:00 am US/Central
Past
W42003D01 - ENGINEERING SERVICES - 43RD STREET DITCH FINAL DESIGN
Due
2/29/2024 10:00 am US/Central
Past
J03006D03 - UV Disinfection System Pilot
Due
3/1/2024 10:00 am US/Central
Past
J04079E01 - Dryer Train Overhaul and Upgrades Preliminary Engineering Services – Condition Assessment
Due
3/1/2024 1:00 pm US/Central
Past
P-3179 - Professional Services - Weather Forecasting
Due
3/5/2024 10:30 am US/Central
Past
G98025C01 - Mineral Street Overpass Green Infrastructure
Due
3/12/2024 10:00 am US/Central
Past
W10006E01 - Preliminary Engineering - North Avenue Fish Passage
Due
3/21/2024 10:00 am US/Central
Due Soon
J06090C01 - Clarifier Cathodic Protection Electrical Isolation at JIWRF
Due
3/22/2024 9:00 am US/Central
Due Soon
W98008C07, W98008C08, W98008C09, W98008C10 - 2024 Watercourse Maintenance Contracts – Northeast, Northwest, Southeast, Southwest
Due
3/26/2024 10:00 am US/Central
Open
W98008C02, W98008C06 - 2024-2027 Watercourse Maintenance Invasive Species Management (Lincoln Creek) (30th St Corridor North & East Basins)
Due
3/28/2024 10:00 am US/Central
Open
G98028P01 - Fresh Coast Green Schoolyards Program: City of Milwaukee Phase Two
Due
4/1/2024 10:30 am US/Central
Open
J06081C01 - Phase 1 Motor Control Center Replacements at Jones Island Water Reclamation Facility
Due
1/31/2026 9:00 am US/Central
Open
TS-2720 - NATIVE LANDSCAPE MANAGEMENT CONTRACTORS
Due
3/28/2019 10:30 am US/Central
Past
P01005C03 - Pump Station Replacements Interplant Sludge Station Improvements (Quest #6118940)
Due
3/23/2021 10:00 am US/Central
Past
G98009P04 - NEIGHBORHOOD OUTREACH AND GREEN INFRASTRUCTURE INSTALLATION CITY OF MILWAUKEE 2021
Due
3/24/2021 10:00 am US/Central
Past
P-2989 - Furnish and Deliver 400 HP Explosion Proof Electrical Motor
Due
3/25/2021 10:00 am US/Central
Past
J06080C04 - Jones Island Water Reclamation Facility Building 263B Crane Repairs
Due
3/25/2021 2:00 pm US/Central
Past
S06038C15 - Polymer Pump Nos. 4, 5 and 6 Replacement at South Shore Water Reclamation Facility
Due
3/26/2021 10:00 am US/Central
Past
TS-2685 - ON-CALL ENGINEERING SERVICES FOR ELECTRICAL, INSTRUMENTATION AND CONTROL PROJECTS
Due
4/1/2021 10:00 am US/Central
Past
W40002A02 - Pulaski Park - Professional Services for Post-Construction Change Order Review
Due
4/6/2021 10:00 am US/Central
Past
P-2970 - Approach Channel Entry and Rescue Upgrades
Due
4/7/2021 1:00 pm US/Central
Past
M03108P01 - Planning Services – Impact of Water Levels on District Assets WATER RECLAMATION FACILITIES AND DISTRICT HEADQUARTERS
Due
4/9/2021 10:00 am US/Central
Past
S06038C16 - WASTE ACTIVATED SLUDGE PUMP REPLACEMENTS AT SOUTH SHORE WATER RECLAMATION FACILITY
Due
4/16/2021 10:00 am US/Central
Past
P-2960 - RFQ: Private Property Infiltration and Inflow Reduction Municipal Contractors
Due
4/20/2021 10:00 am US/Central
Past
G98007P31 - Green Infrastructure (GI) Condition Assessments
Due
4/23/2021 10:00 am US/Central
Past
M01037C04 - Acid Crock Treatment Project
Due
4/26/2021 10:00 am US/Central
Past
ON HOLD P-2990 - Flexible Packaging and Pre-Formed Bag Supplies
Due
4/28/2021 10:00 am US/Central
Past
J04061C03 - PLC 5 UPGRADE IN THE DEWATERING AND DRYING FACILITY (Rebid)
Due
4/30/2021 10:00 am US/Central
Past
C01006E02 - Metropolitan Interceptor Sewer Condition Assessment
Due
4/30/2021 1:00 pm US/Central
Past
J06082D01 - ENGINEERING SERVICES - JONES ISLAND WATER RECLAMATION FACILITY FLOOD RESILIENCY IMPROVEMENTS
Due
5/3/2021 10:00 am US/Central
Past
P-2993 - LOW VOLTAGE SWITCHGEAR (RFI)
Due
5/3/2021 10:00 am US/Central
Past
P-2994 - MOTOR CONTROL CENTER (RFI)
Due
5/3/2021 1:00 pm US/Central
Past
J06083D01 - Engineering Services - HVAC System Improvements in Buildings 234, 235, 243, and 256 at Jones Island Water Reclamation Facility
Due
5/3/2021 5:00 pm US/Central
Past
P-2996 - RFQ: Consultants To Provide Cost Estimates
Due
5/6/2021 10:00 am US/Central
Past
W40012D01 - ENGINEERING SERVICES - KINNICKINNIC RIVER REACH 2 SOUTH 6TH TO 16TH STREET FINAL DESIGN
Due
5/6/2021 2:00 pm US/Central
Past
J06075C17 - Bar Screen Nos. 1, 2, 4, 7 and 8 Rehabilitation and Bar Screen No. 6 Replacement at the Jones Island Water Reclamation Facility
Due
5/12/2021 10:00 am US/Central
Past
TS-2686 - On-Call Construction Services for Repairs to Aeration Basins at South Shore Water Reclamation Facility
Due
5/18/2021 3:00 pm US/Central
Past
M03107P01 - PROCESS MODELING SERVICES WATER RECLAMATION FACILITIES
Due
5/20/2021 2:00 pm US/Central
Past
J06080C06 - TUNNEL 271 PIPING REPLACEMENT & STRUCTURAL REPAIRS AT JONES ISLAND WATER RECLAMATION FACILITIY
Due
5/27/2021 10:00 am US/Central
Past
W40016C01 - Kinnickinnic River Sewer Modifications
Due
5/27/2021 2:00 pm US/Central
Past
C98055C01 - DC0101 GATE REPLACEMENTS AT SOUTH 27TH STREET AND HOWARD AVENUE
Due
6/2/2021 10:30 am US/Central
Past
C06022C01 - Metropolitan Interceptor Sewer System Conveyance Structures Improvements
Due
6/3/2021 10:00 am US/Central
Past
J06075C13 - Process Air Compressors 2 and 3 Exciter Control Replacement at Jones Island Water Reclamation Facility
Due
6/3/2021 2:00 pm US/Central
Past
J06075C20 - Dryer 1 Ring and Pinion Gear Replacement and Alignment at the Jones Island Water Reclamation Facility
Loading
It appears you have deactivated your alerts. This probably occurred when you clicked the checkbox that said "Prevent this page from creating additional dialogs".
Image of checkbox deactivation alert
Because the alerts have been disabled, your confirmation action cannot be captured and we cannot proceed with this process.
To clear this issue and get you on your way, it will be necessary to (1) log-off, (2) log back in, and (3) return to this process. In some cases, it may be necessary to completely close this Internet browser and other related windows after you logoff to fully clear the setting.
When presented in the future with an alert, please do not click the "Prevent this page from creating additional dialogs" checkbox, as the situation will repeat.
Thank you!